BESS Scenarios

This section discusses some of the possible scenarios that can be simulated in iPool.

What-If Scenarios

To evaluate the impact of Battery Energy Storage Systems (BESS) on the grid under different conditions, several simulation scenarios are defined. Below is the list of scenario IDs and their corresponding descriptions used in the system:

SCENARIO IDDESCRIPTION
ORIG_NOBESSThe Base Case scenario simulating a 7-day period using historical demand and generation data.
WIF_NOBESSBased on the Base Case scenario, featuring a 15% increase in system demand and a 500% increase in solar generation, with no BESS operation.
WIF_BESSBIDBuilds upon the WIF_NOBESS scenario by introducing BESS market bids.
• BESS in LUZON: 2 x 500 MW
WIF_BESSOPTBuilds upon the WIF_BESSBID scenario. BESS operation is optimized through net system demand levelization rather than bids.
• BESS in LUZON: 2 x 500 MW
WIF_BESSOPTBIDBuilds upon the WIF_NOBESS scenario by introducing optimized BESS market bids.
• BESS in LUZON: 2 x 500 MW